Annual Plan

Search Filters

Annual Plan Projects

Found 0 project
No projects found
Try adjusting your search criteria or filters

Search reviews

Reviews

524 review plans found
Prefilled syringes — Part 2: Plunger stoppers for dental local anaesthetic cartridges
Medical Devices and Supplies Committee Decision: Confirmation Adopted by the Council on 10/08/2026
Ceramic tiles — Part 8: Determination of linear thermal expansion
Construction products Committee Decision: Update
Thermal performance of buildings — Calculation of internal temperatures of a room in summer without mechanical cooling — General criteria and validation procedures
Energy performance of buildings — Calculation of energy use for space heating and cooling
Soil quality — Determination of elemental composition by X-ray fluorescence
Environment Committee Decision: Update
Water quality — Sampling — Part 5: Guidance on sampling of drinking water from treatment works and piped distribution systems
Water quality — Sampling — Part 6: Guidance on sampling of rivers and streams
Animal feeding stuffs — Determination of acid detergent fibre (ADF) and acid detergent lignin (ADL) contents
Animal Feed Committee Decision: Confirmation Adopted by the Council on 10/08/2026
Textile machinery — Noise test code — Part 3: Nonwoven machinery
Reciprocating internal combustion engine driven alternating current generating sets - Part 3: Alternating current generators for generating sets
Machinery, Vehicles, and Accessories Committee Decision: Update