Annual Plan

Search Filters

Annual Plan Projects

Found 57 project
Portable foam fire extinguishers
Fuel Equipment and Fire Safety Update
Carbon dioxide portable extinguishers
Fuel Equipment and Fire Safety Update
Portable kerosene heating stoves
Fuel Equipment and Fire Safety Update
Fire-resistant door units and smoke-resistant door units: smoke doors
Fuel Equipment and Fire Safety New
Fire door assemblies and smoke door assemblies: installation of doors - Part 4: Fire Rotates - FIRE DOOR AND SMOKE DOOR ASSEMBLIES: SWINGING FIRE DOORS INSTALLATION
Fuel Equipment and Fire Safety Update
TANKERS FOR TRANSPORT OF DANGEROUS GOODS: GENERAL REQUIREMENTS
Fuel Equipment and Fire Safety Update
LPG equipment and accessories - Welded steel pressure vessels for LPG road tankers - Design and manufacture
Fuel Equipment and Fire Safety Adopted by the Council as a standard on 2026-04-13 New
Automotive LPG components - Containers
Fuel Equipment and Fire Safety Adopted by the Council as a standard on 2026-04-13 New
LPG equipment and accessories - Transportable refillable welded aluminium cylinders for liquefied petroleum gas (LPG) - Design and construction
Fuel Equipment and Fire Safety New
Smoke and heat control systems - Part 4: Installed SHEVS systems for smoke and heat ventilation
Fuel Equipment and Fire Safety New

Search reviews

Reviews

524 review plans found
Horizontal joints between load-bearing walls and concrete floors - Laboratory mechanical tests - Effect of vertical loading and of moments transmitted by the floors 
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Medical devices — Connectors for reservoir delivery systems for healthcare applications — Part 8: Citrate-based anticoagulant solution for apheresis applications
Suction catheters for use in the respiratory tract
Medical Devices and Supplies Committee Decision: Update
Ceramic tiles — Part 3: Determination of water absorption, apparent porosity, apparent relative density and bulk density
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Ceramic tiles — Part 4: Determination of modulus of rupture and breaking strength
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Ceramic tiles — Part 15: Determination of lead and cadmium given off by glazed tiles
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Ceramic tiles — Part 12: Determination of frost resistance
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Ceramic tiles — Part 16: Determination of small colour differences
Construction products Committee Decision: Confirmation Adopted by the Council on 13/04/2026
Surgical instruments – non-cutting, articulated instruments – General requirements and test methods
Medical Devices and Supplies Committee Decision: Update
Bases for design of structures — Seismic actions on structures
Construction products Committee Decision: Confirmation Adopted by the Council on 10/08/2026