Annual Plan

Search Filters

Annual Plan Projects

Found 28 project
Forensic sciences — Part 5: Reporting
Medical Laboratories New
Biotechnology — Inventory of methods for detection of microbiological contamination in mammalian cell culture
Medical Laboratories New
Biotechnology — Massively parallel sequencing — Part 3: General requirements and guidance for metagenomics
Medical Laboratories New
Biotechnology — Nucleic acid synthesis — Part 1: Requirements for the production and quality control of synthesized oligonucleotides
Medical Laboratories New
Biotechnology — Genome editing
Medical Laboratories New
Requirements and recommendations for supervisors and operators of point-of-care testing (POCT) equipment
Medical Laboratories New
Forensic sciences — Part 4: Interpretation
Medical Laboratories New
Automated liquid handling systems —Part 3: Determination, specification and reporting of volumetric performance
Medical Laboratories New
Automated liquid handling systems – Uncertainty of the measurement procedures
Medical Laboratories New
Laboratory glassware — Pyknometers
Medical Laboratories New

Search reviews

Reviews

475 review plans found
Safety requirements for industrial laundry machinery — Part 2: Washing machines and washer-extractors
Robots and robotic devices — Safety requirements for industrial robots — Part 1: Robots
Safety requirements for industrial laundry machinery — Part 3: Washing tunnel lines including component machines
Safety requirements for industrial laundry machinery — Part 4: Air dryers
Safety requirements for industrial laundry machinery — Part 5: Flatwork ironers, feeders and folders
Safety requirements for industrial laundry machinery — Part 6: Ironing and fusing presses
Industrial sewing machines — Safety requirements for sewing machines, units and systems
Fertilizers — Determination of acid-soluble potassium content — Preparation of the test solution
Reciprocating internal combustion engines — Handle starting equipment — Part 1: Safety requirements and tests
Reciprocating internal combustion engines — Handle starting equipment — Part 2: Method of testing the angle of disengagement