Annual Plan
Search Filters
Annual Plan Projects
Found 480 project
PPS 798-5
2026
Playground equipment – Part 5: Additional specific safety requirements and test methods for carousels
PPS 4077
2026
Feedstuff – Corn Grain
PPS 55-2-8
2026
Testing concrete – Part 2-8: Fresh concrete- bleeding
PPS 3453
2026
Agricultural Pesticides - Permethrin
PPS 883-1
2026
TANKERS FOR TRANSPORT OF DANGEROUS GOODS: GENERAL REQUIREMENTS
PPS 3457
2026
Pesticides – Flow-release insecticides (concentrated aqueous suspensions)
PPS 3460
2026
Fertilizers and soil conditioners — Liquid methylene-urea slow release fertilizers — General requirements
PPS 3461
2026
Fertilizers, soil conditioners and beneficial substances — Simultaneous determination of N-(n-Butyl) thiophosphoric triamide and dicyandiamide by high-performance liquid chromatography
PPS 3213
2026
Gas cylinders — Specifications and testing of LPG cylinder valves — Manually operated
PPS 3214-3
2026
FIRE HYDRANT: ABOVE-GROUND, WET-BARREL HYDRANT
Search reviews
Reviews
475 review plans found
2026
Safety requirements for industrial laundry machinery — Part 2: Washing machines and washer-extractors
2026
Robots and robotic devices — Safety requirements for industrial robots — Part 1: Robots
2026
Safety requirements for industrial laundry machinery — Part 3: Washing tunnel lines including component machines
2026
Safety requirements for industrial laundry machinery — Part 4: Air dryers
2026
Safety requirements for industrial laundry machinery — Part 5: Flatwork ironers, feeders and folders
2026
Safety requirements for industrial laundry machinery — Part 6: Ironing and fusing presses
2026
Industrial sewing machines — Safety requirements for sewing machines, units and systems
2026
Fertilizers — Determination of acid-soluble potassium content — Preparation of the test solution
2026
Reciprocating internal combustion engines — Handle starting equipment — Part 1: Safety requirements and tests
2026
Reciprocating internal combustion engines — Handle starting equipment — Part 2: Method of testing the angle of disengagement