Annual Plan

Search Filters

Annual Plan Projects

Found 512 project
Footwear — Critical substances potentially present in footwear and footwear components — Determination of phenol in footwear materials
Footwear and Leather New
Fertilizer and chemical injection system — Part 2: Water-Driven Chemical Injector Pump
Agricultural Structures New
Ventilation and acceptable indoor air quality
Agricultural Structures New
Code for design of surface farm drainage system
Agricultural Structures New
Domestic and non-domestic gas-fired forced convection air heaters for space heating not exceeding a net heat input of 300 kW
Agricultural Structures Update
Traveller irrigation machines — Part 1: Operational characteristics and laboratory and field test methods
Agricultural Structures Adopted by the Council as a standard on 2026-04-13 New
Plastics — Film and sheeting — Determination of tear resistance — Part 1: Trouser tear method
Agricultural Structures New
Traveller irrigation machines — Part 2: Softwall hose and couplings — Test methods
Agricultural Structures Adopted by the Council as a standard on 2026-04-13 New
Agricultural irrigation equipment — Centre-pivot and moving lateral irrigation machines with sprayer or sprinkler nozzles — Determination of uniformity of water distribution
Agricultural Structures Adopted by the Council as a standard on 2026-04-13 New
Agricultural irrigation equipment — Guideline on the implementation of pressurized irrigation systems — Part 1: General principles of irrigation
Agricultural Structures Adopted by the Council as a standard on 2026-04-13 New

Search reviews

Reviews

540 review plans found
Plastics — Injection moulding of test specimens of thermoplastic materials — Part 2: Small tensile bars
End-Suction Centrifugal Pumps (Rating 16 Bar)-Baseplate and Installation Dimensions
End-Suction Centrifugal Pumps(rating 16 bar)-Dimensions of Cavities for Mechanical Seals and Soft Packing
Head of copper alloy - non rising stem
Medical devices utilizing animal tissues and their derivatives — Part 4: Principles for elimination and/or inactivation of transmissible spongiform encephalopathy (TSE) agents and validation assays for those processes
Fertilizers and liming materials –Sampling and sample preparation- Part 1 :Sampling:
Soil, treated biowaste and sludge – Determination of pH
Environment Committee Decision: Update
Liquified petroleum gas (LPG) burning domestic water heaters
Paving test methods - Tests of soils and aggregates
Security doors assemblies: Main entrance doors for dwellings, offices and businesses - Production